Process before the pitch
Solar permits & interconnection
Deals often die after a great quote — when HOA reviews, fire setbacks, or utility PTO timelines show up late. Passing a municipal inspection is not the same as Permission to Operate.
Local AHJ / seeded guides
Utility interconnection (IOUs)
Full interconnect + PTO steps live on each utility guide.
- PG&E (CA) interconnect
- SCE (CA) interconnect
- Hawaiian Electric (HI) interconnect
- FPL (FL) interconnect
- SDG&E (CA) interconnect
- Eversource MA (MA) interconnect
- National Grid MA (MA) interconnect
- ComEd (IL) interconnect
- PSE&G (NJ) interconnect
- Oncor (TX) interconnect
- ConEd (NY) interconnect
- JCP&L (NJ) interconnect
- CenterPoint Energy (TX) interconnect
- APS (AZ) interconnect
- Atlantic City Electric (NJ) interconnect
- Dominion Energy VA (VA) interconnect
- Georgia Power (GA) interconnect
- Xcel Energy CO (CO) interconnect
- Duke Energy Carolinas (NC) interconnect
- Ameren Illinois (IL) interconnect
- BGE (MD) interconnect
- Duke Energy Florida (FL) interconnect
- PECO (PA) interconnect
- Pepco MD (MD) interconnect
Need address-level permit lookup after signup? Create a project and open the Permits tab. Incentives · City guides