Utility interconnection · Northern California

PG&E Interconnection: what happens after you say yes

Soft costs and surprise process are why excited buyers ghost installers. This checklist is a planning overview — always confirm current rules with the authority having jurisdiction and your utility.

  1. 1

    Apply for interconnection (Rule 21)

    Submit a PG&E interconnection application for your inverter/system size. For residential NEM / Net Billing Tariff (successor to NEM 2.0 / NEM 3.0 era), use the standard online application.

    PG&E Interconnection
  2. 2

    Net Billing Tariff awareness

    California's Net Billing Tariff (often referred to with NEM 3.0 messaging) credits exports at avoided-cost-based rates. Pairing solar with battery storage typically improves self-consumption and bill savings versus export-heavy designs.

  3. 3

    Permission to Operate (PTO)

    After city/county final inspection and PG&E review, receive Permission to Operate. Do not energize export until PTO is granted.

  4. 4

    Final meter / billing setup

    Confirm your rate schedule and that the bi-directional meter (or equivalent metering) is correctly reflecting generation and usage.