PG&E Interconnection: what happens after you say yes
Soft costs and surprise process are why excited buyers ghost installers. This checklist is a planning overview — always confirm current rules with the authority having jurisdiction and your utility.
- 1
Apply for interconnection (Rule 21)
Submit a PG&E interconnection application for your inverter/system size. For residential NEM / Net Billing Tariff (successor to NEM 2.0 / NEM 3.0 era), use the standard online application.
PG&E Interconnection → - 2
Net Billing Tariff awareness
California's Net Billing Tariff (often referred to with NEM 3.0 messaging) credits exports at avoided-cost-based rates. Pairing solar with battery storage typically improves self-consumption and bill savings versus export-heavy designs.
- 3
Permission to Operate (PTO)
After city/county final inspection and PG&E review, receive Permission to Operate. Do not energize export until PTO is granted.
- 4
Final meter / billing setup
Confirm your rate schedule and that the bi-directional meter (or equivalent metering) is correctly reflecting generation and usage.