Utility interconnection · Southern California

SCE Interconnection: what happens after you say yes

Soft costs and surprise process are why excited buyers ghost installers. This checklist is a planning overview — always confirm current rules with the authority having jurisdiction and your utility.

  1. 1

    Submit SCE interconnection application

    Apply for interconnection with Southern California Edison for your inverter/system size. Keep equipment documentation ready (spec sheets, UL listings).

    SCE
  2. 2

    Net Billing Tariff expectations

    Under California Net Billing, export credits are not classic 1:1 retail NEM. Ask your installer what self-consumption assumptions drive the savings chart.

  3. 3

    Permission to Operate

    Energize export only after SCE issues PTO and local final inspection is complete.

Your home in SCE Interconnection

Create your solar project

Enter your address for a quick teaser. Create a free account for the full Google Solar roof model, ROI dashboard, permits, and PDF report.

All permit guides · Utility bill guides